Althaus Trail North 2020 Storm Water Repairs

This project was awarded to McDermott Excavating.

The Althaus Trail North of Asbury Road 2020 Storm Water Repairs consists of removal of approximately 480 linear feet of asphalt trail and construction of 6-feet wide, 6-inch thick concrete trail in portion of the Althaus Trail located north of Asbury Road.  The work also includes installation of storm sewer structures and HDPE sewer, French drain installation, temporary erosion control, grading and turf restoration. 

Work is set to begin sometime following Labor Day.  

Update - Construction Notice.August 31.2020