Springreen Drive Reconstruction Project

The reconstruction of Springreen Drive (South of Asbury Road to Wintergreen Drive) is being in the spring of 2022.  The City of Asbury will be working with MSA Professional Services (MSA), for the survey, design and bidding of the project.  The preliminary engineering phase will include preparation of a report showing basic roadway configuration, preliminary location of utilities, preliminary locations for sidewalks and preliminary locations of other necessary improvements, and a preliminary construction cost estimate.

Springreen Drive South (Asbury Road to Wintergreen) includes road reconstruction, sidewalks, storm sewer and water main improvements. 

Springreen Drive North (Wintergreen to Hales Mill Road) includes sidewalks. 

A public information meeting was held on August 31, 2021.